Industrial plant of Norddeutschen Affinerie AG in Hamburg
Dr.-Ing. Jörg Kobarg –
Ingenieurbüro für Bauwesen, Hamburg
- Static calculation of stock construction
- Nonlinear system analysis with over 20,000 beams |
 |
Overpass structure on the A7 in Nesselwang - Füssen
Dipl.-Ing. Gunther Chr. Zierl - Planungsbüro für Bau- und
Verkehrswesen
New construction of a prestressed overpass structure on the A7
Modeling and calculation of the entire structure, length 50.5 m
- Technical work
- Structural design |
 |
Erfurt-Würzburg railway line project
Ingenieurbüro
Dipl.-Ing. H. Vössing GmbH
Reinforcement of the
"Harzgasse" viaduct in Suhl, 6-span
arched bridge made of natural stone and quarry, length 50 m,
year of construction: 1880
- Structural planning
- Recalculation of bridge structure according to Ril 805, level
3 with regard to a new roadway slab |
 |
Crane building project - Rheinau Harbor, Cologne
IDK
KLEINJOHANN GmbH & Co. KG, Köln
- Designing variants of load-carrying structures since 1998
- Steel, composite steel and prestressed concrete variants
- Permit and implementation planning of combined pile-slab
foundations
for all three crane buildings 2002/2003
- Structural planning
- Static and dynamic analysis of the entire structure
- Earthquake check
- Prestressed concrete check |
 |
Antenna Mast Project, Pfaffenberg
Ingenieurbüro Schmitt-Stumpf-Frühauf, Munich Tower construction, 180m, reinforced concrete / steel / GPR - Technical work - Structural design - Dynamics incl. earthquake and wind stress |
 |
Wilsdruffer Gate with Tram Stop Roofing Project, Dresden
Ingenieurgesellschaft Horz + Ladewig Köln mbH Cable-braced glass-steel square roofing - Technical work - Structural design including glass statics |
 |
Septic Tank Project, Großlappen, Munich
Zilch + Müller Ingenieure GmbH, Munich - Structural analysis - Spatially curved tendon guides - Analysis of varying filling and structural conditions - Variation of the foundation stiffness |
 |
Saarlandstrasse Project, Dortmund
Engels Ingenieure GmbH, Dortmund - Static analysis Crosscheck deformation, load performance, stiffening - Technical work Fire safety concept and smoke simulation of the underground garage |
 |
Gailbrücke in Villach, Kärnten (Austria)
Bernard Ingenieure ZT-Ges.m.b.H., Vienna Steel railroad structure highly susceptible to oscillation - Dynamic measurements - Crosscheck with simulation of train crossings - Model updating (adjustment to real structural behavior) - Development of a restoration concept |
 |
La-Ferté Bridge, Stuttgart-Zuffenhausen
Peter und Lochner - Beratende Ingenieure für Bauwesen GmbH - Design - Technical work
The design by Dr. Matthias Schüller was awarded first place by the GermanBrückenbaupreis 2006 (Bridge Construction Awards 2006) in the category foot and bicycle bridges. |
 |
Olympic Stadium Roof, Berlin
Specht, Kalleja + Partner GmbH, Berlin - Static analysis
Design: gmp |
 |
National Convention Center - Hanoi, S.R. Vietnam
Inros Lackner AG, Rostock - Structural design - Earthquake checks |
 |
Olympic Stadium 'Panthessaliko', Volos (Greece)
INSTAT S.A. CONSULTING ENGINEERS, Athens - Technical work - Structural design - Steel structural members StE 690 |
 |
Höllgraben Bridge
Bernard Ingenieure ZT-Ges.m.b.H., Hall in Tirol - Technical work - Structural design - Calculation of the creep and shrinkage loss over 7 construction stages |
 |
Conference Center, Vienna
Werner Consult, Vienna - Technical work - Structural design - Earthquake checks |
 |
Steel Helix, Exhibition Object
Ingenieurbüro Gabert, Roetgen - Implementation planning - Structural design with buckling checks |
 |
BMW Welt, Munich
Ingenieurbüro Schmitt-Stumpf-Frühauf, München - Architectural implementation planning - Structural design - Statics
http://www.bmw-welt.com |
 |
Hotel im Kühlturm, Zeche Zollverein, Essen
Dipl.-Ing. N. Hangebrauk, diploma thesis, supervised by SIG, Schürmann IngenieurGesellschaft GmbH & Co.KG, Dortmund - Structural design
Architectural design: KZA, Koschany, Zimmer& Assoziierte GmbH |
 |
Refuse-derived-fuel plant, Cologne
Ingenieurgesellschaft Dr.-Ing. Fischbach mbH, Erftstadt Refuse-derived-fuel plant for Infraserv GmbH & Co. Knapsack KG, Chemiepark Knapsack - Structural design - Earthquake check |
 |
NBS Ebensfeld-Erfurt, EÜ Grümpental Bridge
OBERMEYER Planen und Beraten, Munich Double-track arched railroad bridge with an arch span of 270 m and a bridge length of 1100 m - Structural design - Bridge check according to DIN technical report - Check of the dynamic stressing due to train crossings according to Ril. 804 |
 |
Headquarters Mainova AG, Frankfurt/Main
HAAG Ingenieur GmbH, Darmstadt Main building, office wing and cellar space - Structural design - Earthquake check - Fire safety |
 |
Non-linear calculation of a garbage bunker wall in condition II
InfoGraph GmbH, Aachen Crosscheck with example 15 from: Beispiele zur Bemessung nach DIN 1045-1 (Examples of dimensioning according to DIN 1045-1). Volume 2: Ingenieurbau, Deutscher Beton- und Bautechnik-Verein e.V., Ernst & Sohn Verlag |
 |
VAN Technology Center (VTC) Daimler Chrysler AG, Untertürkheim Plant
BKSi GmbH, Stuttgart (formerly IFB Dr. Braschel AG) - Structural design |
 |
Comparison Stress on a Tube Joint
InfoGraph GmbH, Aachen Detailed analysis on a spatial tube joint - Calculation of the penetration with automatic net generation - Non-linear stress analysis with plasticizing |
 |
Arched Bridge Maulbeerstrasse, Basel
DB Netz AG, bridge measurement and analysis N.BIF - Load capacity assessment of arched bridges - Terms of conveyance for special company trucks |
 |
Exposition Park House Rebstock, Frankfurt/Main
Philipp Holzmann AG |
 |
Billbrook Canal Bridge, Hamburg
Professor Bellmer Ingenieurgruppe GmbH, Bremen - Implementation planning - Structural design |
 |
Rheinau Harbor Cologne, 3 crane houses
Ingenieurbüro Dipl.-Ing. Dieter Kleinjohann, Cologne - Structural design - Earthquake checks - Fire safety |
 |
Trump Tower, Stuttgart
BKSi GmbH, Stuttgart (formerly IFB Dr. Braschel AG) - Structural design - Dynamic analysis |
 |
Munich Stadium
Ingenieurbüro Arup GmbH, Düsseldorf - Structural design - Dynamic analysis of the stands |

|
Girder Grid for Underpinning, Entry Structure Frankfurt Stadium
Ingenieurbüro Schmitt-Stumpf-Frühauf, Munich - Structural design - Contact problem prestressed concrete beams - girder grid - Stress analysis of the prestressed concrete beams |

|
Ludwig Erhard Haus, Berlin
Ingenieurbüro Prof. Breitschuh, Berlin |
 |
Galeria Kaufhof Wiesbaden, Park House Ramp
Ingenieurgemeinschaft Müller GmbH, Wiesbaden - Static calculation |
 |
Henkel Factory Bridge, East Site
Bilfinger Berger AG - Structural design |
 |
Bleiloch Pumped Storage Plant Inclined Hoist, Vattenfall Europe Generation AG & Co. KG, 65[t]
Firma Verbundplan GmbH, Salzburg - Structural design |

|
Hierzmann Barrier
Dr. techn. Kurt Kratzer, Graz - Earthquake check - Slide stability check |

|
Event Roofing, Falkenwiese Nature Spa, Lübeck
Ingenieurbüro vom Felde, Aachen - Structural design |
 |
Dam Bridge
InfoGraph GmbH, Aachen |
 |
Underground Station
Fa. Bilfinger Berger AG - Structural design |